MTOU3 Three-Phase Winding Resistance Ohmmeter
The MTOU3 uses a safe, one-time connection for complete winding resistance assessment of power, distribution, and instrument transformers with automatic adaptive demagnetisation, eliminating the risk of tripping system protection when the transformer is put back into service.
Perform vector confirmation, winding resistance, and demagnetisation tests with the same one-time lead connection.
Guided by color-coded leads and extendable clamps with on-screen vectors that match the transformer nameplate, the easy-to-follow setup ensures the right result the first time - just click start!
Auto vector confirmation before every test ensures that the proper transformer vector is selected.
MTOU3 will not turn on
- Ensure the power cord is connected to the device
- Ensure the power cord is connected to an appropriate outlet
- Ensure the power switch is set to the on position
MTOU3 reports that leads are not connected/reversed
- Check that the leads connected to the MTOU3 are connected properly
- Check that the leads are connected to the transformer and connected to the correct phases
What type and size of transformers do you test? Do you have high current rating on secondary? Do you have OLTCs?
With a large power transformer (>100 MVA) you typically require higher excitation voltage and current for accurate and stable winding resistance results. Whatever your application, there is an MTOU3 model to meet your needs. All MTOU3s come with built in tap changer control to minimize test time on transformers with built-in OLTCs.
How and when is demagnetisation performed?
The MTOU3 uses a demagnetisation process called adaptive demagnetisation. Adaptive demagnetisation uses volts DC to quickly demagnetise any transformer, reducing the time required by more than half on large power transformers. Each MTOU3 comes with auto demagnetisation enabled and intuitively demagnetises the transformer after the completion of winding resistance tests.
When you have questionable winding resistance test results, what is your next step?
When you have questionable results, the next step is to check that the connections from the test set to the transformer are clean and tight. After this, customers often question the reliability/accuracy of the test set. Megger has a portable reference device, the TOS1, for field verification of instrument performance, providing confidence that the correct transformer maintenance decisions can be made.
How do you manage your test results?
The MTOU3 provides data in three formats. Reports of the tests performed are available as Excel or PDF files. These can be used as evidence of work completed and transformer assessment. Also created is a json file. This contains asset and test information and can be used to move data from one TxU test set to another or for import into a data management system, such as PowerDB Lite.